The City of Brockton will develop
a 1 MW Solar array at a former manufactured gas plant site on Grove Street.
The facility will be constructed within an attractively designed park
setting featuring interpretive displays for educational purposes. The first
Phase will feature 425 kW of installed capacity on the parcel known as
"Plot 19" and an educational plaza.
This project
analyzes the case of Brockton,
Massachusetts in developing a
photovoltaic array on a 27-acre brownfield on Grove Street.
The project is
budgeted at $3.02 million, of which $1.6 million will be financed through a
municipal bond issue, $500,000 is provided through a land transaction,
$840,600 from a grant from the Massachusetts Technology Collaborative's
Renewable Energy Trust, and $59,400 (possibly more) through grants from the
US Department of Energy.
About the Grove Street Site
Why a Solar Brightfield?
Project Goals and Objectives
Project Partners
Project Steps and Timeline
Barriers Encountered and Methods for Overcoming
Barriers
Phase I Proposal from Global Solar Team
Lessons Learned
|