WEBVTT

00:00:00.000 --> 00:00:01.988 align:middle line:90%
[SQUEAKING]

00:00:01.988 --> 00:00:03.976 align:middle line:90%
[RUSTLING]

00:00:03.976 --> 00:00:05.467 align:middle line:90%
[CLICKING]

00:00:05.467 --> 00:00:11.440 align:middle line:90%


00:00:11.440 --> 00:00:15.800 align:middle line:84%
MODERATOR: And our next
speaker is Eric Bosworth

00:00:15.800 --> 00:00:17.560 align:middle line:90%
from Eversource Energy.

00:00:17.560 --> 00:00:20.280 align:middle line:84%
And he has collaborated
with Eversource

00:00:20.280 --> 00:00:23.000 align:middle line:84%
in the Framingham site,
acquiring temperature data

00:00:23.000 --> 00:00:24.320 align:middle line:90%
down the boreholes.

00:00:24.320 --> 00:00:28.170 align:middle line:90%


00:00:28.170 --> 00:00:28.920 align:middle line:90%
ERIC BOSWORTH: Hi.

00:00:28.920 --> 00:00:29.540 align:middle line:90%
I'm good.

00:00:29.540 --> 00:00:32.640 align:middle line:84%
I am the privileged
individual that

00:00:32.640 --> 00:00:35.380 align:middle line:84%
gets to run anchor
here before lunch.

00:00:35.380 --> 00:00:37.880 align:middle line:90%
So thanks for bearing with me.

00:00:37.880 --> 00:00:41.420 align:middle line:84%
For those of you that I don't
know, my name is Eric Bosworth.

00:00:41.420 --> 00:00:44.520 align:middle line:84%
I work in the Clean Technologies
Department at Eversource.

00:00:44.520 --> 00:00:47.240 align:middle line:84%
And for better or worse,
I have had the privilege

00:00:47.240 --> 00:00:49.920 align:middle line:84%
of overseeing the
Framingham project

00:00:49.920 --> 00:00:52.180 align:middle line:90%
from before site selection.

00:00:52.180 --> 00:00:55.000 align:middle line:84%
So I joined on to the
team to oversee it

00:00:55.000 --> 00:00:57.200 align:middle line:84%
as we were figuring out
where and how we were going

00:00:57.200 --> 00:00:59.910 align:middle line:84%
to do this and all
the way through today,

00:00:59.910 --> 00:01:04.050 align:middle line:84%
when we are up in operation
with customers using the system.

00:01:04.050 --> 00:01:06.310 align:middle line:84%
So folks have talked
about the project a lot

00:01:06.310 --> 00:01:08.370 align:middle line:84%
over the last day
and a half here.

00:01:08.370 --> 00:01:12.070 align:middle line:84%
I don't need to go over
Framingham necessarily.

00:01:12.070 --> 00:01:14.950 align:middle line:84%
What I'm hoping to do is
bring the perspective of we've

00:01:14.950 --> 00:01:18.350 align:middle line:84%
had a lot of insight into,
what's the big picture?

00:01:18.350 --> 00:01:21.070 align:middle line:84%
What's the policy direction
we need to go into?

00:01:21.070 --> 00:01:23.250 align:middle line:84%
How do we design a
system like this?

00:01:23.250 --> 00:01:25.332 align:middle line:84%
How do we operate
a system like this?

00:01:25.332 --> 00:01:27.790 align:middle line:84%
I'm going to bring you the
perspective of what happens when

00:01:27.790 --> 00:01:30.790 align:middle line:84%
you get out there and start
tearing up pavement and actually

00:01:30.790 --> 00:01:31.590 align:middle line:90%
putting it in.

00:01:31.590 --> 00:01:34.350 align:middle line:84%
Because nothing really
prepares you for that

00:01:34.350 --> 00:01:35.370 align:middle line:90%
until you're into it.

00:01:35.370 --> 00:01:38.030 align:middle line:84%
And there's certainly some
lessons learned and scars

00:01:38.030 --> 00:01:41.070 align:middle line:90%
along the way that you pick up.

00:01:41.070 --> 00:01:44.070 align:middle line:84%
Here's a basic breakdown
of the three main work

00:01:44.070 --> 00:01:46.590 align:middle line:84%
streams that go into
actually building a shared

00:01:46.590 --> 00:01:49.270 align:middle line:90%
thermal network in a community.

00:01:49.270 --> 00:01:50.910 align:middle line:90%
You've got the ground exchanger.

00:01:50.910 --> 00:01:53.310 align:middle line:84%
Brock was just talking
about drilling.

00:01:53.310 --> 00:01:55.430 align:middle line:84%
We've talked about thermal
conductivity testing

00:01:55.430 --> 00:01:58.180 align:middle line:84%
and how the ground
exchanger works.

00:01:58.180 --> 00:02:00.680 align:middle line:84%
It's pretty straightforward,
but that's your energy source.

00:02:00.680 --> 00:02:02.337 align:middle line:84%
You're putting holes
into the ground.

00:02:02.337 --> 00:02:03.920 align:middle line:84%
You're pulling heat
out in the winter.

00:02:03.920 --> 00:02:05.560 align:middle line:84%
You're putting
heat in the summer.

00:02:05.560 --> 00:02:07.500 align:middle line:84%
That's what's
fueling your network.

00:02:07.500 --> 00:02:09.400 align:middle line:84%
But the other pieces
are just important.

00:02:09.400 --> 00:02:11.220 align:middle line:84%
You have the distribution
loop, the pipes

00:02:11.220 --> 00:02:13.060 align:middle line:84%
in the street, the
service lines that you're

00:02:13.060 --> 00:02:14.400 align:middle line:90%
pulling into the homes.

00:02:14.400 --> 00:02:16.980 align:middle line:84%
How do you move the energy
through the neighborhood?

00:02:16.980 --> 00:02:20.780 align:middle line:84%
And then finally, the building
conversions, certainly not third

00:02:20.780 --> 00:02:22.267 align:middle line:90%
in importance here.

00:02:22.267 --> 00:02:24.100 align:middle line:84%
What are you doing to
the building envelope,

00:02:24.100 --> 00:02:26.780 align:middle line:84%
and how are you interfacing
with that thermal network?

00:02:26.780 --> 00:02:29.960 align:middle line:84%
How are you keeping your
customers warm in the winter,

00:02:29.960 --> 00:02:31.220 align:middle line:90%
cool in the summer?

00:02:31.220 --> 00:02:33.740 align:middle line:84%
And what equipment
is involved there?

00:02:33.740 --> 00:02:35.820 align:middle line:84%
So stepping through
each of those,

00:02:35.820 --> 00:02:38.380 align:middle line:84%
I like to start with
main installation

00:02:38.380 --> 00:02:39.340 align:middle line:90%
pipes in the street.

00:02:39.340 --> 00:02:42.700 align:middle line:84%
Because as a utility, this
is our bread and butter.

00:02:42.700 --> 00:02:46.980 align:middle line:84%
We put in hundreds and hundreds
of miles of this HDPE pipe

00:02:46.980 --> 00:02:48.300 align:middle line:90%
every year.

00:02:48.300 --> 00:02:49.148 align:middle line:90%
We know this.

00:02:49.148 --> 00:02:50.440 align:middle line:90%
We know how to open the street.

00:02:50.440 --> 00:02:51.680 align:middle line:90%
We know how to fuse pipe.

00:02:51.680 --> 00:02:53.540 align:middle line:84%
We know how to get
it into the ground.

00:02:53.540 --> 00:02:57.090 align:middle line:84%
We know how to test it, to the
points that Mark brought up,

00:02:57.090 --> 00:02:58.930 align:middle line:84%
making sure that
the fusions are good

00:02:58.930 --> 00:03:02.650 align:middle line:84%
and the pressure testing is
appropriate and documented.

00:03:02.650 --> 00:03:05.430 align:middle line:84%
This part of the
project was, I will say,

00:03:05.430 --> 00:03:10.210 align:middle line:84%
the smoothest part from
a timeline, a cost,

00:03:10.210 --> 00:03:11.830 align:middle line:90%
an execution standpoint.

00:03:11.830 --> 00:03:13.110 align:middle line:90%
Our crews know how to do this.

00:03:13.110 --> 00:03:15.890 align:middle line:84%
We actually took crews
that had been putting

00:03:15.890 --> 00:03:19.210 align:middle line:84%
gas pipe in the year before,
did a little bit of retraining

00:03:19.210 --> 00:03:21.250 align:middle line:84%
on them, showed them how
to stencil geothermal

00:03:21.250 --> 00:03:24.307 align:middle line:84%
on the side of the pipe, and
they were off to the races.

00:03:24.307 --> 00:03:25.890 align:middle line:84%
They got out there,
and they installed

00:03:25.890 --> 00:03:29.250 align:middle line:84%
all of this mile of pipe,
plus all 38 services,

00:03:29.250 --> 00:03:31.650 align:middle line:90%
in about two to three months.

00:03:31.650 --> 00:03:32.310 align:middle line:90%
It was great.

00:03:32.310 --> 00:03:34.570 align:middle line:90%
It was exactly as we planned it.

00:03:34.570 --> 00:03:36.930 align:middle line:84%
Similarly, the
service lines, just

00:03:36.930 --> 00:03:39.010 align:middle line:84%
like a water service
or a gas service

00:03:39.010 --> 00:03:42.290 align:middle line:84%
or anything else that you would
pull to a home, we dug a trench.

00:03:42.290 --> 00:03:44.630 align:middle line:84%
There's two lines in this
case, instead of one.

00:03:44.630 --> 00:03:46.690 align:middle line:84%
So we have a send
and receive line.

00:03:46.690 --> 00:03:49.670 align:middle line:84%
But for the most part, it's
all the same materials.

00:03:49.670 --> 00:03:51.778 align:middle line:84%
It's HDPE pipe
that we're fusing.

00:03:51.778 --> 00:03:53.070 align:middle line:90%
We're pulling it into the home.

00:03:53.070 --> 00:03:55.090 align:middle line:84%
We're putting it into a
pair of shut-off valves

00:03:55.090 --> 00:03:56.870 align:middle line:90%
on the inside of the basement.

00:03:56.870 --> 00:03:59.810 align:middle line:84%
And it feels just
like utility work.

00:03:59.810 --> 00:04:01.450 align:middle line:84%
Even from the outside,
if you watched

00:04:01.450 --> 00:04:04.577 align:middle line:84%
a crew doing this trenching,
repaving in the street,

00:04:04.577 --> 00:04:06.910 align:middle line:84%
you'd have no idea that they
were putting geothermal in.

00:04:06.910 --> 00:04:09.690 align:middle line:84%
It just looks like
everyday utility work.

00:04:09.690 --> 00:04:13.090 align:middle line:84%
So these two work
streams, great, fantastic.

00:04:13.090 --> 00:04:14.110 align:middle line:90%
We understand them.

00:04:14.110 --> 00:04:15.510 align:middle line:90%
We do them all the time.

00:04:15.510 --> 00:04:17.570 align:middle line:90%
They were easy.

00:04:17.570 --> 00:04:18.570 align:middle line:90%
Borefield drilling?

00:04:18.570 --> 00:04:21.390 align:middle line:84%
Eh, not necessarily
a utility's forte.

00:04:21.390 --> 00:04:23.130 align:middle line:84%
I think this is one
of the first times

00:04:23.130 --> 00:04:25.650 align:middle line:84%
that at least a gas
utility in the nation

00:04:25.650 --> 00:04:29.970 align:middle line:84%
has drilled boreholes, and
there were some lessons learned.

00:04:29.970 --> 00:04:32.090 align:middle line:84%
Brock talked a lot
about this, so I'm not

00:04:32.090 --> 00:04:34.990 align:middle line:84%
going to harp too much
on drilling specifically.

00:04:34.990 --> 00:04:37.210 align:middle line:84%
But there's questions
about site layout

00:04:37.210 --> 00:04:39.630 align:middle line:84%
and what formation
are you drilling in.

00:04:39.630 --> 00:04:41.030 align:middle line:90%
How quickly can you drill?

00:04:41.030 --> 00:04:43.730 align:middle line:84%
How do you manage your
water and your cuttings?

00:04:43.730 --> 00:04:44.830 align:middle line:90%
We were learning.

00:04:44.830 --> 00:04:46.190 align:middle line:90%
We brought in experts.

00:04:46.190 --> 00:04:47.390 align:middle line:90%
They did a great job.

00:04:47.390 --> 00:04:49.510 align:middle line:84%
They designed great
ground exchangers.

00:04:49.510 --> 00:04:51.410 align:middle line:90%
They executed well.

00:04:51.410 --> 00:04:54.960 align:middle line:84%
But for us, as the utility, it
was more a learning opportunity

00:04:54.960 --> 00:04:55.660 align:middle line:90%
than anything.

00:04:55.660 --> 00:04:58.360 align:middle line:84%
We certainly weren't out
there directing the drillers

00:04:58.360 --> 00:05:00.220 align:middle line:90%
on how to run their operation.

00:05:00.220 --> 00:05:03.240 align:middle line:84%
We were letting the experts
do what they do best.

00:05:03.240 --> 00:05:05.860 align:middle line:84%
And then in the future,
we look at Framingham.

00:05:05.860 --> 00:05:08.000 align:middle line:84%
We potentially have an
expansion coming up here

00:05:08.000 --> 00:05:09.380 align:middle line:90%
in the next year or two.

00:05:09.380 --> 00:05:11.720 align:middle line:84%
And we've learned some
lessons from the first time

00:05:11.720 --> 00:05:14.800 align:middle line:84%
around that we will apply
the next time we go out

00:05:14.800 --> 00:05:15.900 align:middle line:90%
to drill a borefield.

00:05:15.900 --> 00:05:17.780 align:middle line:84%
And hopefully, we
can do it quicker,

00:05:17.780 --> 00:05:20.320 align:middle line:84%
we can do it more cost
effectively the second time

00:05:20.320 --> 00:05:21.760 align:middle line:90%
around.

00:05:21.760 --> 00:05:24.020 align:middle line:84%
Just to talk a little
bit to the pictures here,

00:05:24.020 --> 00:05:25.580 align:middle line:90%
there's a lot going on.

00:05:25.580 --> 00:05:27.480 align:middle line:84%
But we did take
advantage of some

00:05:27.480 --> 00:05:30.200 align:middle line:84%
of those nice deviated drilling
techniques on our project

00:05:30.200 --> 00:05:32.020 align:middle line:84%
that you can see
here on the left.

00:05:32.020 --> 00:05:33.760 align:middle line:84%
And then on the
right, that's what

00:05:33.760 --> 00:05:36.618 align:middle line:84%
the manifold looks like when
you come out of a borehole.

00:05:36.618 --> 00:05:38.660 align:middle line:84%
So once you've got all
those holes in the ground,

00:05:38.660 --> 00:05:40.860 align:middle line:84%
you got to tie them
together with pipes.

00:05:40.860 --> 00:05:43.120 align:middle line:84%
So you pull all of
the inlets and outlets

00:05:43.120 --> 00:05:45.220 align:middle line:90%
together into a single vault.

00:05:45.220 --> 00:05:47.220 align:middle line:84%
You have a nice, long
header for each of them.

00:05:47.220 --> 00:05:50.340 align:middle line:84%
And that way, you can control
the individual borehole runs.

00:05:50.340 --> 00:05:53.250 align:middle line:84%
You can turn them on and off
with valves if you want to.

00:05:53.250 --> 00:05:54.490 align:middle line:90%
You can pressure test them.

00:05:54.490 --> 00:05:55.870 align:middle line:84%
You can make sure
that the system

00:05:55.870 --> 00:05:59.650 align:middle line:84%
is on and running appropriately
before you cover it back up.

00:05:59.650 --> 00:06:02.530 align:middle line:84%
Because again, Mark mentioned
this multiple times--

00:06:02.530 --> 00:06:04.310 align:middle line:84%
but you really, really
want to make sure

00:06:04.310 --> 00:06:06.590 align:middle line:84%
that there are no issues
or leaks before you

00:06:06.590 --> 00:06:09.510 align:middle line:90%
backfill these systems.

00:06:09.510 --> 00:06:12.290 align:middle line:84%
The pump house, kind of similar
to the distribution loop.

00:06:12.290 --> 00:06:14.630 align:middle line:84%
But this is the only
above-ground structure

00:06:14.630 --> 00:06:16.670 align:middle line:90%
on our system.

00:06:16.670 --> 00:06:19.650 align:middle line:84%
We chose to do it as a
prefabricated building.

00:06:19.650 --> 00:06:21.770 align:middle line:84%
So we came in, and
we laid a foundation.

00:06:21.770 --> 00:06:24.710 align:middle line:84%
We had as much of the mechanical
work and piping and electrical

00:06:24.710 --> 00:06:27.710 align:middle line:84%
done as we possibly could
beforehand and then dropped

00:06:27.710 --> 00:06:31.430 align:middle line:84%
the building down on top of
the foundation afterwards.

00:06:31.430 --> 00:06:34.130 align:middle line:84%
And really, all it does is
it's got the central pumps.

00:06:34.130 --> 00:06:36.943 align:middle line:84%
It's got our control system, and
it's got a little bit of backup

00:06:36.943 --> 00:06:39.110 align:middle line:84%
in the sense that we have
a central boiler in there,

00:06:39.110 --> 00:06:42.190 align:middle line:84%
just in case we need to add
some heat to the system.

00:06:42.190 --> 00:06:44.090 align:middle line:90%
It was designed to not need it.

00:06:44.090 --> 00:06:46.790 align:middle line:84%
But as a utility,
the very first time

00:06:46.790 --> 00:06:48.710 align:middle line:84%
out, we want to
make absolutely sure

00:06:48.710 --> 00:06:52.220 align:middle line:84%
that there are no problems with
the operation of the system.

00:06:52.220 --> 00:06:53.940 align:middle line:84%
That comes back to
customer perception

00:06:53.940 --> 00:06:55.970 align:middle line:84%
and could affect
adoption long term.

00:06:55.970 --> 00:06:59.935 align:middle line:84%
So for our project, it also
now serves as a very nice area

00:06:59.935 --> 00:07:01.560 align:middle line:84%
where, when we come
out and have tours,

00:07:01.560 --> 00:07:03.900 align:middle line:84%
we can talk through some
of the equipment involved

00:07:03.900 --> 00:07:05.860 align:middle line:90%
and how the system works.

00:07:05.860 --> 00:07:07.900 align:middle line:84%
It's really paid
dividends to end up

00:07:07.900 --> 00:07:10.420 align:middle line:90%
going above ground in this case.

00:07:10.420 --> 00:07:12.580 align:middle line:84%
We won't necessarily
always do that.

00:07:12.580 --> 00:07:15.320 align:middle line:84%
Looking to future iterations,
we may volt pumps.

00:07:15.320 --> 00:07:18.060 align:middle line:84%
We may bury things if we
don't have the space to do it.

00:07:18.060 --> 00:07:19.900 align:middle line:84%
But at least in
Framingham, the pump house

00:07:19.900 --> 00:07:23.340 align:middle line:90%
was a critical part of the loop.

00:07:23.340 --> 00:07:26.020 align:middle line:84%
Finally, getting into
building conversions.

00:07:26.020 --> 00:07:30.420 align:middle line:84%
This has by far been and was
the most challenging part

00:07:30.420 --> 00:07:33.620 align:middle line:84%
of getting a system
online and running.

00:07:33.620 --> 00:07:36.170 align:middle line:84%
Having the loop in the street,
having it on and running,

00:07:36.170 --> 00:07:37.920 align:middle line:84%
we kind of knew what
we were getting into.

00:07:37.920 --> 00:07:41.360 align:middle line:84%
It wasn't necessarily all skill
sets that we were familiar with,

00:07:41.360 --> 00:07:44.180 align:middle line:90%
but we knew what to expect.

00:07:44.180 --> 00:07:47.400 align:middle line:84%
Building conversions,
every single one,

00:07:47.400 --> 00:07:49.530 align:middle line:84%
you have no idea what
you're getting into when

00:07:49.530 --> 00:07:50.930 align:middle line:90%
you get into that building.

00:07:50.930 --> 00:07:52.190 align:middle line:90%
We found mold.

00:07:52.190 --> 00:07:53.550 align:middle line:90%
We found asbestos.

00:07:53.550 --> 00:07:55.930 align:middle line:90%
We found knob and tube wiring.

00:07:55.930 --> 00:07:59.270 align:middle line:84%
You name it, we found it in one
of these homes or buildings.

00:07:59.270 --> 00:08:01.850 align:middle line:84%
And that may be somewhat
unique to the building stock

00:08:01.850 --> 00:08:04.730 align:middle line:84%
here in the Northeast,
but it's a reality

00:08:04.730 --> 00:08:06.910 align:middle line:90%
of large retrofit projects.

00:08:06.910 --> 00:08:09.650 align:middle line:84%
You're going to have to tackle
these types of problems.

00:08:09.650 --> 00:08:12.530 align:middle line:84%
So from an execution
standpoint, we really

00:08:12.530 --> 00:08:15.710 align:middle line:84%
tried to individualize it
for all of our customers,

00:08:15.710 --> 00:08:18.630 align:middle line:84%
get into their home, explain
exactly what we needed to do,

00:08:18.630 --> 00:08:20.070 align:middle line:90%
how we were going to do it.

00:08:20.070 --> 00:08:21.330 align:middle line:90%
We ran ducting.

00:08:21.330 --> 00:08:25.310 align:middle line:84%
We did about 15 to 20 main panel
upgrades in this neighborhood.

00:08:25.310 --> 00:08:29.363 align:middle line:84%
So it wasn't just, how
do I put a heat pump in?

00:08:29.363 --> 00:08:31.030 align:middle line:84%
That's generally
pretty straightforward.

00:08:31.030 --> 00:08:32.210 align:middle line:90%
You get the unit in.

00:08:32.210 --> 00:08:33.510 align:middle line:90%
You may need some ducting.

00:08:33.510 --> 00:08:36.330 align:middle line:84%
You may need to adjust the
existing ducting in the room.

00:08:36.330 --> 00:08:39.429 align:middle line:84%
But the rest of the
building is important too.

00:08:39.429 --> 00:08:40.429 align:middle line:90%
Are we air sealing?

00:08:40.429 --> 00:08:41.510 align:middle line:90%
Are we weatherizing?

00:08:41.510 --> 00:08:43.669 align:middle line:84%
Are we upgrading
electrical systems?

00:08:43.669 --> 00:08:47.760 align:middle line:84%
So the whole picture ends up
playing into what the building

00:08:47.760 --> 00:08:49.220 align:middle line:90%
conversions look like.

00:08:49.220 --> 00:08:52.040 align:middle line:84%
And we demonstrated virtually
every type of conversion,

00:08:52.040 --> 00:08:54.960 align:middle line:84%
as well, on this project
that you can have.

00:08:54.960 --> 00:08:57.200 align:middle line:84%
The good news is there's
equipment out there

00:08:57.200 --> 00:08:59.160 align:middle line:90%
to tackle almost all of it.

00:08:59.160 --> 00:09:02.980 align:middle line:84%
Most of the residential homes
were using forced-air systems.

00:09:02.980 --> 00:09:03.620 align:middle line:90%
So we came in.

00:09:03.620 --> 00:09:04.580 align:middle line:90%
We put a heat pump in.

00:09:04.580 --> 00:09:07.320 align:middle line:84%
We distributed it with
ducting and air systems.

00:09:07.320 --> 00:09:09.560 align:middle line:84%
The commercial buildings,
we had rooftop units

00:09:09.560 --> 00:09:12.440 align:middle line:84%
that we could actually just
lift their old unit off and drop

00:09:12.440 --> 00:09:14.080 align:middle line:84%
their new unit on
top of the roof

00:09:14.080 --> 00:09:16.600 align:middle line:84%
and reuse all of the
existing distribution

00:09:16.600 --> 00:09:18.000 align:middle line:90%
system in the building.

00:09:18.000 --> 00:09:20.360 align:middle line:84%
And then we had some
more niche applications,

00:09:20.360 --> 00:09:22.240 align:middle line:84%
things like console
units that look

00:09:22.240 --> 00:09:24.960 align:middle line:84%
almost like one of those
hotel air conditioners that

00:09:24.960 --> 00:09:26.280 align:middle line:90%
sit under the window.

00:09:26.280 --> 00:09:29.600 align:middle line:84%
We put those into a number
of the subsidized housing

00:09:29.600 --> 00:09:31.880 align:middle line:90%
apartments on this loop as well.

00:09:31.880 --> 00:09:35.180 align:middle line:84%
And just to emphasize that it's
not necessarily, will it work?

00:09:35.180 --> 00:09:39.680 align:middle line:84%
It's, how do I make it work
with every single one of these?

00:09:39.680 --> 00:09:41.685 align:middle line:84%
Finally, overall
project management.

00:09:41.685 --> 00:09:44.060 align:middle line:84%
I talked a little bit about
this on building conversions.

00:09:44.060 --> 00:09:47.430 align:middle line:84%
But making sure
that we were having

00:09:47.430 --> 00:09:50.230 align:middle line:84%
a very detailed and
customer-focused approach

00:09:50.230 --> 00:09:53.110 align:middle line:84%
through the entire
project was important too.

00:09:53.110 --> 00:09:56.030 align:middle line:84%
As a utility, generally,
we stay in the streets.

00:09:56.030 --> 00:09:56.978 align:middle line:90%
We're putting pipes.

00:09:56.978 --> 00:09:57.770 align:middle line:90%
We're pulling them.

00:09:57.770 --> 00:10:01.350 align:middle line:84%
There's a demarcation point, and
everything downstream is usually

00:10:01.350 --> 00:10:03.110 align:middle line:90%
the customer's responsibility.

00:10:03.110 --> 00:10:04.890 align:middle line:90%
Not in the case of this project.

00:10:04.890 --> 00:10:08.070 align:middle line:84%
The scope of our pilot
approved by the department

00:10:08.070 --> 00:10:11.150 align:middle line:84%
was including all of the
building-side equipment

00:10:11.150 --> 00:10:12.070 align:middle line:90%
and work.

00:10:12.070 --> 00:10:15.130 align:middle line:84%
So we had to manage that
part of the project as well.

00:10:15.130 --> 00:10:17.130 align:middle line:84%
We were meeting with the
customers in the field.

00:10:17.130 --> 00:10:18.410 align:middle line:90%
We were explaining things.

00:10:18.410 --> 00:10:21.490 align:middle line:84%
We were having them look at
exactly what was going in,

00:10:21.490 --> 00:10:22.653 align:middle line:90%
where it was going in.

00:10:22.653 --> 00:10:24.070 align:middle line:84%
We were getting
feedback on things

00:10:24.070 --> 00:10:26.970 align:middle line:84%
like, I'd like the ducting
over here versus over there.

00:10:26.970 --> 00:10:28.890 align:middle line:90%
Can you box it in with drywall?

00:10:28.890 --> 00:10:30.790 align:middle line:90%
Can you paint it after the fact?

00:10:30.790 --> 00:10:35.110 align:middle line:84%
All of these little details that
make project management very

00:10:35.110 --> 00:10:36.250 align:middle line:90%
challenging.

00:10:36.250 --> 00:10:37.710 align:middle line:90%
But it's extremely important.

00:10:37.710 --> 00:10:40.070 align:middle line:84%
Because at the end of the
day, I want these customers

00:10:40.070 --> 00:10:41.370 align:middle line:90%
to have a good experience.

00:10:41.370 --> 00:10:43.073 align:middle line:84%
I want them to like
their new systems,

00:10:43.073 --> 00:10:44.990 align:middle line:84%
and I want them to tell
all of their neighbors

00:10:44.990 --> 00:10:47.110 align:middle line:84%
about how great it was,
as well, because that's

00:10:47.110 --> 00:10:52.206 align:middle line:84%
how we grow the system and
get adoption to continue.

00:10:52.206 --> 00:10:54.683 align:middle line:84%
Summing up the construction
side of things.

00:10:54.683 --> 00:10:57.090 align:middle line:84%
Timeline and parallel
work streams.

00:10:57.090 --> 00:10:59.050 align:middle line:84%
If I were to go do
this project again,

00:10:59.050 --> 00:11:00.950 align:middle line:84%
there are a lot of
levers I could pull here

00:11:00.950 --> 00:11:04.130 align:middle line:84%
for having
simultaneous jobs go on

00:11:04.130 --> 00:11:06.893 align:middle line:84%
so that my overall
timeline could be shrunk.

00:11:06.893 --> 00:11:08.310 align:middle line:84%
I think in the
second iteration, I

00:11:08.310 --> 00:11:11.670 align:middle line:84%
could probably trim about
25% to 30% of our schedule

00:11:11.670 --> 00:11:15.910 align:middle line:84%
off if I was going into it
knowing what I know now.

00:11:15.910 --> 00:11:18.370 align:middle line:84%
There are always the
traditional utility challenges.

00:11:18.370 --> 00:11:20.870 align:middle line:84%
We ran into buried
infrastructure

00:11:20.870 --> 00:11:23.433 align:middle line:84%
that wasn't on any map,
wasn't on any diagram.

00:11:23.433 --> 00:11:25.350 align:middle line:84%
And you're digging along,
and all of a sudden,

00:11:25.350 --> 00:11:28.030 align:middle line:84%
you see a wooden
conduit in the street.

00:11:28.030 --> 00:11:29.610 align:middle line:84%
So you got to
navigate around it.

00:11:29.610 --> 00:11:31.690 align:middle line:84%
You have to make some
on-the-job decisions,

00:11:31.690 --> 00:11:34.990 align:middle line:84%
some on-the-fly
changes to your system.

00:11:34.990 --> 00:11:36.910 align:middle line:90%
Those were manageable.

00:11:36.910 --> 00:11:39.720 align:middle line:84%
There were some
geothermal-specific challenges.

00:11:39.720 --> 00:11:42.620 align:middle line:84%
The drilling went well,
but there was a learning

00:11:42.620 --> 00:11:44.360 align:middle line:90%
curve there, the geology.

00:11:44.360 --> 00:11:46.040 align:middle line:84%
What type of drilling
we were using?

00:11:46.040 --> 00:11:47.680 align:middle line:90%
We tried air hammer.

00:11:47.680 --> 00:11:48.760 align:middle line:90%
We did mud rotary.

00:11:48.760 --> 00:11:52.060 align:middle line:84%
We kind of traded off to decide
what was exactly the best way

00:11:52.060 --> 00:11:54.700 align:middle line:84%
to drill in this
specific neighborhood.

00:11:54.700 --> 00:11:57.520 align:middle line:84%
And then on the HVAC side
of things, to this day,

00:11:57.520 --> 00:12:00.420 align:middle line:84%
I'm still helping customers
dial their systems in.

00:12:00.420 --> 00:12:03.400 align:middle line:84%
So it's not necessarily, as
soon as everything is installed,

00:12:03.400 --> 00:12:05.480 align:middle line:84%
you walk away and
it runs perfectly.

00:12:05.480 --> 00:12:09.340 align:middle line:84%
There is definitely a period
of adjustment and improvement

00:12:09.340 --> 00:12:12.180 align:middle line:84%
and optimization
that you can make.

00:12:12.180 --> 00:12:13.400 align:middle line:90%
Site access and scheduling.

00:12:13.400 --> 00:12:15.650 align:middle line:84%
This was actually something
that ended up affecting us

00:12:15.650 --> 00:12:19.040 align:middle line:84%
quite a lot in terms of
overall project schedule.

00:12:19.040 --> 00:12:22.600 align:middle line:84%
But the reality is you're
installing these in a community.

00:12:22.600 --> 00:12:23.640 align:middle line:90%
It's people's yards.

00:12:23.640 --> 00:12:25.000 align:middle line:90%
It's people's homes.

00:12:25.000 --> 00:12:26.360 align:middle line:90%
It's school property.

00:12:26.360 --> 00:12:28.797 align:middle line:84%
And so when you're first
planning the project,

00:12:28.797 --> 00:12:30.380 align:middle line:84%
you're not necessarily
thinking about,

00:12:30.380 --> 00:12:33.380 align:middle line:84%
ooh, maybe they're not going
to let me drill or have access

00:12:33.380 --> 00:12:35.720 align:middle line:84%
to the school
property in the fall,

00:12:35.720 --> 00:12:38.860 align:middle line:84%
as everything is ramping up and
students are all coming back.

00:12:38.860 --> 00:12:41.230 align:middle line:84%
Individual customers,
they go on vacation.

00:12:41.230 --> 00:12:42.338 align:middle line:90%
They have their own lives.

00:12:42.338 --> 00:12:43.630 align:middle line:90%
They have their work schedules.

00:12:43.630 --> 00:12:45.530 align:middle line:84%
So you have to
really work around

00:12:45.530 --> 00:12:48.970 align:middle line:84%
all of the individual pieces to
get everything to come together.

00:12:48.970 --> 00:12:51.470 align:middle line:84%
Otherwise, you find yourself
sitting and waiting and saying,

00:12:51.470 --> 00:12:54.630 align:middle line:84%
well, I guess I can't get
access to the site today.

00:12:54.630 --> 00:12:56.670 align:middle line:90%
Let's wait a week until I can.

00:12:56.670 --> 00:12:59.810 align:middle line:84%
And that has impacts
on the overall job.

00:12:59.810 --> 00:13:02.710 align:middle line:84%
Finally, I mentioned these, but
unknown building conditions.

00:13:02.710 --> 00:13:06.290 align:middle line:84%
I'm going to mention it
again because it was such

00:13:06.290 --> 00:13:08.050 align:middle line:90%
a challenge on the project.

00:13:08.050 --> 00:13:11.930 align:middle line:84%
Really taking good stock of what
buildings are in your planned

00:13:11.930 --> 00:13:14.450 align:middle line:84%
community or planned
area, understanding

00:13:14.450 --> 00:13:17.150 align:middle line:84%
what some of the common things
that you may encounter are,

00:13:17.150 --> 00:13:19.890 align:middle line:84%
and having a plan
for it ahead of time.

00:13:19.890 --> 00:13:23.970 align:middle line:84%
Asbestos remediation delayed
some of our building conversions

00:13:23.970 --> 00:13:27.210 align:middle line:84%
a good three to four
months in this case.

00:13:27.210 --> 00:13:30.610 align:middle line:84%
We got into, specifically,
the low-income housing

00:13:30.610 --> 00:13:32.090 align:middle line:90%
apartment buildings.

00:13:32.090 --> 00:13:35.610 align:middle line:84%
We realized there may be some
asbestos in the joining compound

00:13:35.610 --> 00:13:38.340 align:middle line:84%
and the walls that they had
used to construct those.

00:13:38.340 --> 00:13:40.240 align:middle line:84%
And it was about a
four-month process

00:13:40.240 --> 00:13:45.000 align:middle line:84%
to test every single unit,
document it with the state,

00:13:45.000 --> 00:13:48.700 align:middle line:84%
come up with a remediation
plan, have that plan approved,

00:13:48.700 --> 00:13:51.920 align:middle line:84%
and then have qualified
contractors come in,

00:13:51.920 --> 00:13:53.760 align:middle line:84%
set up all of their
air containment,

00:13:53.760 --> 00:13:55.840 align:middle line:84%
and do that remediation
so that we could actually

00:13:55.840 --> 00:13:57.340 align:middle line:90%
install the heat pumps.

00:13:57.340 --> 00:13:59.200 align:middle line:84%
So it's those types
of things that when

00:13:59.200 --> 00:14:01.080 align:middle line:84%
you're in the initial
planning stage,

00:14:01.080 --> 00:14:03.360 align:middle line:84%
if you know there's a chance
that these buildings may

00:14:03.360 --> 00:14:07.020 align:middle line:84%
have asbestos in them, go ahead
and test it during design.

00:14:07.020 --> 00:14:08.740 align:middle line:84%
Come up with your
remediation plan.

00:14:08.740 --> 00:14:11.390 align:middle line:84%
That way, when you're
into project execution,

00:14:11.390 --> 00:14:13.140 align:middle line:84%
you've got it all baked
into the schedule,

00:14:13.140 --> 00:14:18.532 align:middle line:84%
and it's not going to delay that
particular part of the project.

00:14:18.532 --> 00:14:20.740 align:middle line:84%
Moving on a little bit to
commissions and operations.

00:14:20.740 --> 00:14:23.200 align:middle line:84%
Because as I said, once
the system is in the ground

00:14:23.200 --> 00:14:25.340 align:middle line:84%
physically, that does
not necessarily mean

00:14:25.340 --> 00:14:27.320 align:middle line:90%
it's up and running.

00:14:27.320 --> 00:14:31.080 align:middle line:84%
A lot of lessons learned
and challenges here as well.

00:14:31.080 --> 00:14:34.440 align:middle line:84%
These screenshots here below are
from our real-time SCADA system.

00:14:34.440 --> 00:14:37.550 align:middle line:84%
There was a great discussion
earlier around optimization

00:14:37.550 --> 00:14:39.710 align:middle line:84%
and control and
feedback on how you

00:14:39.710 --> 00:14:43.550 align:middle line:84%
run and operate one of these
thermal energy networks.

00:14:43.550 --> 00:14:44.410 align:middle line:90%
That's what we did.

00:14:44.410 --> 00:14:46.930 align:middle line:84%
We had a SCADA system
set up so that real time,

00:14:46.930 --> 00:14:49.490 align:middle line:84%
anytime of the day, I can
see what my pump speeds are.

00:14:49.490 --> 00:14:50.730 align:middle line:90%
I can see my temperatures.

00:14:50.730 --> 00:14:52.090 align:middle line:90%
I can see my pressures.

00:14:52.090 --> 00:14:54.190 align:middle line:84%
I can see customer
behavior based

00:14:54.190 --> 00:14:56.550 align:middle line:84%
on the historic
temperature trends.

00:14:56.550 --> 00:15:00.850 align:middle line:84%
So getting that system up and
running was almost step one.

00:15:00.850 --> 00:15:02.690 align:middle line:84%
Before I could even
add a single customer,

00:15:02.690 --> 00:15:05.470 align:middle line:84%
I wanted to be able to
see the system remotely

00:15:05.470 --> 00:15:07.590 align:middle line:90%
in a web-based SCADA.

00:15:07.590 --> 00:15:11.610 align:middle line:84%
In addition to that, borefield
flushing, pressure testing,

00:15:11.610 --> 00:15:13.190 align:middle line:84%
getting air out of
the system, these

00:15:13.190 --> 00:15:16.450 align:middle line:84%
are all steps that we had
to take as we turned it on,

00:15:16.450 --> 00:15:19.670 align:middle line:84%
as we started the pumps up,
and as we added customer loads

00:15:19.670 --> 00:15:22.930 align:middle line:84%
to make sure that there wasn't
any disruption in service.

00:15:22.930 --> 00:15:26.630 align:middle line:84%
Because the last thing that I
wanted was to add a customer

00:15:26.630 --> 00:15:28.890 align:middle line:84%
and then shut them down
immediately, right thereafter

00:15:28.890 --> 00:15:30.890 align:middle line:84%
and say, ooh, something's
wrong with the system.

00:15:30.890 --> 00:15:31.250 align:middle line:90%
Hang on.

00:15:31.250 --> 00:15:33.510 align:middle line:84%
Let me address that, and
we'll come back in a few days

00:15:33.510 --> 00:15:35.060 align:middle line:90%
and turn you back on.

00:15:35.060 --> 00:15:38.060 align:middle line:84%
So a lot of work
went into making sure

00:15:38.060 --> 00:15:41.200 align:middle line:84%
that the system was on,
stable, free of air,

00:15:41.200 --> 00:15:44.070 align:middle line:84%
running properly before we
could add customer loads.

00:15:44.070 --> 00:15:46.527 align:middle line:90%


00:15:46.527 --> 00:15:48.360 align:middle line:84%
And then on the building
commissioning side,

00:15:48.360 --> 00:15:49.860 align:middle line:84%
once the loop is
on and running, now

00:15:49.860 --> 00:15:52.060 align:middle line:84%
you got to turn the
buildings on as well.

00:15:52.060 --> 00:15:55.120 align:middle line:84%
So that followed a
very similar process.

00:15:55.120 --> 00:15:57.000 align:middle line:84%
But it was about getting
the equipment in,

00:15:57.000 --> 00:15:58.960 align:middle line:84%
making sure the
electrical work was done,

00:15:58.960 --> 00:16:00.475 align:middle line:90%
the plumbing work was done.

00:16:00.475 --> 00:16:03.100 align:middle line:84%
You then have to pressure test
everything on the building side,

00:16:03.100 --> 00:16:04.820 align:middle line:84%
as well, because the
last thing you want

00:16:04.820 --> 00:16:08.920 align:middle line:84%
is a leak in one of these pipes
carrying water and some glycol,

00:16:08.920 --> 00:16:12.700 align:middle line:84%
in this case, that's going to
flood a basement, flood a room.

00:16:12.700 --> 00:16:14.882 align:middle line:84%
Again, the perspective
there from the customer,

00:16:14.882 --> 00:16:17.340 align:middle line:84%
it's not going to be a very
good one if you have to come in

00:16:17.340 --> 00:16:19.240 align:middle line:84%
and say, sorry, I just
flooded your basement.

00:16:19.240 --> 00:16:22.020 align:middle line:84%
I'm going to pump it out,
but let me try again.

00:16:22.020 --> 00:16:25.540 align:middle line:84%
So a lot of testing, getting
the equipment on and running,

00:16:25.540 --> 00:16:27.980 align:middle line:84%
and then opening those
valves and actually

00:16:27.980 --> 00:16:29.780 align:middle line:84%
tying it into the main
loop and making sure

00:16:29.780 --> 00:16:33.740 align:middle line:84%
that it's getting
energy from the system.

00:16:33.740 --> 00:16:36.340 align:middle line:84%
One of the challenges
that I faced

00:16:36.340 --> 00:16:41.320 align:middle line:84%
is, because we were reusing
traditional gas contractors,

00:16:41.320 --> 00:16:44.900 align:middle line:84%
they had a perception around
how you should handle valves

00:16:44.900 --> 00:16:46.540 align:middle line:90%
on this system.

00:16:46.540 --> 00:16:48.880 align:middle line:84%
In their mind, open
valves are good.

00:16:48.880 --> 00:16:50.380 align:middle line:84%
You want every
valve on the system

00:16:50.380 --> 00:16:52.560 align:middle line:84%
open because in a gas
system, that's what you do.

00:16:52.560 --> 00:16:53.840 align:middle line:90%
You open everything up.

00:16:53.840 --> 00:16:54.860 align:middle line:90%
You've got flow.

00:16:54.860 --> 00:16:56.300 align:middle line:90%
You're great.

00:16:56.300 --> 00:16:57.900 align:middle line:84%
I had to go through
that entire system

00:16:57.900 --> 00:17:00.100 align:middle line:84%
and check every
single bypass valve

00:17:00.100 --> 00:17:04.040 align:middle line:84%
that I had because 75%
of them were left open.

00:17:04.040 --> 00:17:06.800 align:middle line:84%
What that means is, when I
turn a customer system on,

00:17:06.800 --> 00:17:08.720 align:middle line:84%
they're not exchanging
fluid with the loop.

00:17:08.720 --> 00:17:10.780 align:middle line:84%
They're exchanging
fluid with themselves,

00:17:10.780 --> 00:17:13.079 align:middle line:84%
and their systems very
quickly cool down.

00:17:13.079 --> 00:17:13.880 align:middle line:90%
They shut off.

00:17:13.880 --> 00:17:15.020 align:middle line:90%
They throw an error.

00:17:15.020 --> 00:17:17.180 align:middle line:84%
So it's those types of
things in troubleshooting

00:17:17.180 --> 00:17:20.460 align:middle line:84%
through the commissioning
that, the next time around, I'm

00:17:20.460 --> 00:17:23.140 align:middle line:84%
going to be totally sure
every bypass on a system

00:17:23.140 --> 00:17:27.140 align:middle line:84%
is closed before I
turn a customer on.

00:17:27.140 --> 00:17:28.140 align:middle line:90%
So lessons learned.

00:17:28.140 --> 00:17:29.920 align:middle line:90%
Procedures and compliance.

00:17:29.920 --> 00:17:33.010 align:middle line:84%
I cannot stress enough how
important it is to know what

00:17:33.010 --> 00:17:34.870 align:middle line:90%
you're doing before you do it.

00:17:34.870 --> 00:17:36.770 align:middle line:90%
Have a documented procedure.

00:17:36.770 --> 00:17:39.330 align:middle line:84%
Make sure you check it
with your engineering

00:17:39.330 --> 00:17:42.450 align:middle line:84%
team, your external engineers,
experts in the industry that

00:17:42.450 --> 00:17:43.690 align:middle line:90%
have done this before.

00:17:43.690 --> 00:17:44.590 align:middle line:90%
Have them look at it.

00:17:44.590 --> 00:17:46.690 align:middle line:84%
They're going to have
some great feedback.

00:17:46.690 --> 00:17:47.750 align:middle line:90%
Valve positioning.

00:17:47.750 --> 00:17:50.770 align:middle line:84%
Don't need to harp on it
again, but it's very important.

00:17:50.770 --> 00:17:52.350 align:middle line:90%
Loop flushing and purging.

00:17:52.350 --> 00:17:55.610 align:middle line:84%
The biggest issue that I
have seen on our system,

00:17:55.610 --> 00:17:57.850 align:middle line:90%
at least, is air.

00:17:57.850 --> 00:17:59.262 align:middle line:90%
There's a procedure.

00:17:59.262 --> 00:18:00.470 align:middle line:90%
There's a flushing procedure.

00:18:00.470 --> 00:18:02.470 align:middle line:84%
But there's always a
little bit of entrained air

00:18:02.470 --> 00:18:03.190 align:middle line:90%
in these systems.

00:18:03.190 --> 00:18:05.650 align:middle line:84%
And so getting it out
is extremely important

00:18:05.650 --> 00:18:07.597 align:middle line:84%
because it can shut
down customer systems.

00:18:07.597 --> 00:18:08.430 align:middle line:90%
You got to come out.

00:18:08.430 --> 00:18:09.390 align:middle line:90%
It's a trouble call.

00:18:09.390 --> 00:18:10.270 align:middle line:90%
You purge the air.

00:18:10.270 --> 00:18:11.970 align:middle line:90%
You start them back up.

00:18:11.970 --> 00:18:16.130 align:middle line:84%
So definitely a step you don't
want to shortcut or miss.

00:18:16.130 --> 00:18:17.430 align:middle line:90%
Troubleshooting systems.

00:18:17.430 --> 00:18:20.270 align:middle line:84%
Fortunately, as we've
gone into operation here,

00:18:20.270 --> 00:18:22.430 align:middle line:84%
the problems have
decreased dramatically.

00:18:22.430 --> 00:18:24.467 align:middle line:84%
We're having less
issues, errors,

00:18:24.467 --> 00:18:26.550 align:middle line:84%
reasons that we need to
go out and address things.

00:18:26.550 --> 00:18:29.920 align:middle line:84%
But you always need to be ready
to do that, especially at first.

00:18:29.920 --> 00:18:32.640 align:middle line:84%
And then finally, I threw
temporary space conditioning

00:18:32.640 --> 00:18:35.920 align:middle line:84%
in here because on the theme
of scheduling and having work

00:18:35.920 --> 00:18:39.780 align:middle line:84%
done simultaneously, the
way our project played out,

00:18:39.780 --> 00:18:43.080 align:middle line:84%
you didn't necessarily
have every single building

00:18:43.080 --> 00:18:45.340 align:middle line:84%
ready to just be turned
on straight away.

00:18:45.340 --> 00:18:47.660 align:middle line:84%
There was a process for
building conversions.

00:18:47.660 --> 00:18:50.540 align:middle line:84%
So we actually had to have
a plan in the schools,

00:18:50.540 --> 00:18:51.228 align:middle line:90%
for example.

00:18:51.228 --> 00:18:53.520 align:middle line:84%
When we were pulling those
rooftop units on and putting

00:18:53.520 --> 00:18:57.037 align:middle line:84%
the new ones back, how are we
keeping that space conditioned?

00:18:57.037 --> 00:18:58.620 align:middle line:84%
Do we have temporary
air conditioners?

00:18:58.620 --> 00:18:59.890 align:middle line:90%
Do we have temporary heaters?

00:18:59.890 --> 00:19:03.720 align:middle line:84%
So all playing into the whole
project management and logistics

00:19:03.720 --> 00:19:06.360 align:middle line:84%
of a system like this
and how you actually

00:19:06.360 --> 00:19:08.840 align:middle line:90%
build it and turn it on.

00:19:08.840 --> 00:19:12.080 align:middle line:84%
Going forward, I have a
laundry list of things

00:19:12.080 --> 00:19:14.780 align:middle line:84%
that I'm going to be able to
address the next time around

00:19:14.780 --> 00:19:15.640 align:middle line:90%
and head off.

00:19:15.640 --> 00:19:17.440 align:middle line:84%
So with that, hopefully
I stayed on time.

00:19:17.440 --> 00:19:19.570 align:middle line:84%
And we've got a little
bit of time here for Q&A.

00:19:19.570 --> 00:19:20.920 align:middle line:90%
[APPLAUSE]

00:19:20.920 --> 00:19:22.750 align:middle line:90%
MODERATOR: Thank you.

00:19:22.750 --> 00:19:29.000 align:middle line:90%