The calendar below provides information on the course’s lecture (L) and seminar (S) sessions.
WEEK # | SES # | TOPICS | SPEAKERS | KEY DATES |
---|---|---|---|---|
1 | L1 | Subject introduction, resume writing | E. Adams | Assignment 1 out |
S1 | The MIT career services | D. Rosencrans | Assignment 1a due | |
2 | L2 | Technical writing | E. Adams and D. Levey | |
L3 | Project evaluation 1 | E. Adams | Assignment 2 out | |
S2 | Boston’s water distribution system as a black box: impact on water quality and effect of ozone | W. Sung (MWRA) | Assignment 1b due | |
3 | L4 | Getting work | W. Vicens (CDM) and P. Shanahan | Assignment 3 out |
L5 | Oral presentation | E. Adams | Assignment 2a due | |
S3 | Mullholland’s dream | Video: Cadillac Desert: Mulholland’s Dream (Water and the Transformation of Nature) |
Assignment 4 out Assignment 3a due |
|
4 | L6 | Project evaluation 2; in-class discussion | A. Chow and E. Adams | Assignment 2b due |
S4 | Integrated engineering design and construction | J. P. Chakar (Buro Happold) | Assignment 3b due | |
5 | L7 | Project management 1 | C. Ho (Arup) | Assignment 5 out |
L8 | Project evaluation 3 | S. Murcott | ||
S5 | Issues in the structural engineering of tall buildings | R. McNamara (McNamara/Salvia) | Assignment 4a due | |
6 | L9 | Project management 2 | C. Ho (Arup) | Assignment 5a due |
S6 | Live design: mitigating extreme events | G. Dasgupta (Columbia University) | ||
7 | L10 | Job placement | D. Orton (VHB) and M. Wiseheart (PowerAdvocate) | |
L11 | Project management 3 | E. Adams | Assignment 5b due | |
S7 | Water reclamation and recycling projects in California | M. Van Horne (RMC Water and Environmental) | Assignment 3c due | |
8 | L12 | Engineering and construction industry 1 | C. Helliwell | Assignment 6 out |
L13 | Engineering and construction industry 2 | C. Helliwell | ||
S8 | Mulch biowalls for enhanced bioremediation | J. Travers (Parsons) | ||
9 | L14 | Chase an engineer; group discussion | E. Adams | Assignment 3d due |
L15 | Engineering and construction industry 3 | C. Helliwell | Assignment 6 due | |
S9 | Green buildings at MIT; presentations | W. Henry | Assignment 4b due | |
10 | L16 | Negotiation 1 | A. Chow and E. Adams | |
L17 | Negotiation 2 | E. Adams and A. Chow | ||
S10 | Expectations for a structural engineering graduate | E. Nelson | ||
11 | L18 | Professional ethics 1: basis for decision making; student skits | E. Adams | Assignment 7 out |
S11 | The first steps after a failure | D. Peraza (Exponent) | ||
12 | L19 | Professional ethics 2: student debates on case studies | E. Adams and A. Chow | Assignment 7 due |
S12 | Untitled | D. Farnsworth (Arup) | ||
S13 | Final proposals (to client); student presentations |
Assignment 8 out Assignment 4c due |
||
13 | L20 | Student presentations (cont.) | Assignment 8 due |