| LEC # | TOPICS | KEY DATES |
|---|---|---|
| 1 | Introduction and Examples | |
| 2 | Design and Safety Factors | |
| 3 | Site Investigation: Methodology | |
| 4 | Boreholes and Soil Sampling | |
| 5 | Stratigraphy Classification Schemes | |
| 6 | Engineering Properties SPT/FV/PCPT in Situ Tests | |
| 7 | Spread Foundation Design | |
| 8 | Bearing Capacity 1 | |
| 9 | Bearing Capacity 2 | Homework 1 due |
| 10 | Strength Parameters for Soils | |
| 11 | Allowable Settlements | |
| 12 | Settlements on Sand 1 | |
| 13 | Settlements on Sand 2 | Term paper outline due |
| 14 | Settlements on Clay 1 | |
| 15 | Settlements on Clay 2 | |
| 16 | Soil-structure Interaction | Homework 2 due |
| 17 | Pile Types and Selection | |
| 18 | Characteristic Pile Behavior | |
| 19 | Single Pile Capacity 1 | |
| 20 | Single Pile Capacity 2 | |
| 21 | Settlement of Single Pile 1 | Homework 3 due |
| 22 | Pile Group Behavior 1 | |
| 23 | Pile Group Behavior 2 | |
| 24 | Lateral Loading of Piles | |
| 25 | Pile Driving | |
| 26 | Pile Load Tests | |
| 27 | Negative Skin Friction | |
| 28 | Slope Stability Methods 1 | Homework 4 due |
| 29 | Slope Stability Methods 2 | |
| 30 | Slope Stability Methods 3 | |
| 31 | Earth Retaining Structures | |
| 32 | Earth Pressures - Review | |
| 33 | Cantilever and Propped Walls | |
| 34 | Tie Back Anchors | |
| 35 | Braced Excavations 1 | |
| 36 | Braced Excavations 2 | |
| 37 | Reinforced Soil | Homework 5 due |
| 38 | Soil Nailing | Term paper due |
| 39 | Geosynthetic Reinforcement | |
| Final Exam |
Calendar
Course Info
Instructor
Departments
As Taught In
Fall
2003
Level
Course Info
Instructor
Departments
As Taught In
Fall
2003
Level
Topics
Learning Resource Types
assignment
Design Assignments
grading
Exams
assignment
Written Assignments