| LEC # | TOPICS |
|---|---|
| 1 | Introduction |
| 2 | Project Financing and Evaluation |
| 3 | Tools for Project Evaluation |
| 4 | Dealing with Uncertainty: Concepts and Tools |
| 5 | Project Organization |
| 6 | Delivery Methods (cont.), Payment and Award Techniques |
| 7 | Award Methods and Project Estimation I |
| 8 | Detailed Estimation and Pumpstation Overview |
| 9 | Planning and Deterministic Scheduling |
| 10 | Deterministic Planning II and Probabilistic Planning I |
| 11 | Probabilistic Planning II |
| 12 | Simulation and Resource-Based Scheduling |
| 13 | Basics of Cost and Schedule Monitoring |
| 14 | EVA (C/SCSC) and Basics of Project Control |
| 15 | Problem Diagnosis and Introduction to Project Dynamics |
| 16 | System and Change Dynamics |
| 17 | Risk Management II, Quality Monitoring and Control, and Project Learning |
| 18 | Reviews (cont.), Audits, Changes and Disputes |