There will be several assignments throughout the semester leading up to a final project that reports the work you have done throughout the semester.
Assignments are due during the weeks indicated in the table below.
| WEEK # | ASSIGNMENTS | DESCRIPTIONS |
|---|---|---|
| 2 | Future scenarios assignment | Future scenarios (PDF) |
| 3 |
Landscape units and site physiography mapping and transects assignment due Alternatives and new approaches to site and infrastructure technologies assignment |
Inventory (PDF) Site and infrastructure technologies I (PDF) Site and infrastructure technologies II (PDF) |
| 5 | Technology-driven schematic site plan investigation assignment due | Site plan (PDF) |
| 7 | Sekisui presentations | Each team will give a PowerPoint presentation summarizing the goals of their project and findings so far. |
| 8-10 | Preparation of final project | Final project tasks (PDF) |
| 12 | Final site plans and typologies |