Projects
Group 1 Assignment 3
Description:
Example of a completed group project to develop the plan of the upper area of the Shougang (Capital Steel Factory) site in as much architectural detail as possible in order to illustrate how the design will connect to the different uses and conditions across the site by Claire Abrahamse, Josh Fiala, Christine Outram, Zhai Wensi, and Li Ye.
Resource Type:
Projects
pdf
3 MB
Group 1 Assignment 3
Course Info
Instructor
Departments
As Taught In
Summer
2008
Level
Topics
Learning Resource Types
group_work
Projects with Examples
assignment_turned_in
Presentation Assignments with Examples